Tarkett offers quality home flooring products to meet the demands of a busy home including waterproof and scratch resistant floors along with quick and easy installation options.
Tarkett flooring installation guide.
How to repair your vinyl flooring depends on the type of product you have and how it s damaged.
The surface of the concrete must be dry clean smooth levelandstructurallysound the slabshall be swept damp mopped and or vacuumed to remove any dust.
Installation instructions refer to astm f2419 standard practice for installation of thick poured gypsum concrete underlayments and preparation of the surface to receive resilient flooring for guidelines when pouring gypsum underlayments or preparing for use as an underlayment under tarkett products.
Tarkett carpet tile installation guide floors on which a previous covering was adhered all floors on which some form of covering was previously adhered require a thorough inspection as per the requirements of as 2455 1 2007 as 2455 2 2007.
Tarkett offers a full range of flooring solutions for any commercial space from carpet to resilient flooring along with coordinating flooring accessories.
Tarkett laminate flooring is generally laid as a floating installation.
In the unlikely case that you should replace a damaged plank of starfloor click 55 luxury vinyl tiles.
Horizontal storagef wrong transport storage and or handling could damage the flooring causing aesthetical.
Upgrade your home with beautiful flooring styles including lvt vinyl sheet and laminate.
Released may 2013 page 1 of 2 expressions vct inst 050713.
Tarkett flooring and adhesives must be site conditioned at room temperature for a minimum of 48 hours prior to during and after installation.
Upright storagef or 2m rolls.
Installation and report to tarkett representative.
To get started you need to do the following.
In most cases you need to remove the existing floor covering.
Remove your vinyl floor from its packaging and keep it in the room where it is to be.
For each continuous surface use the same batch number and install rolls boxes in sequential order installation instructions 2 or modular productsf or 2m rolls.
However there are a few exceptions.
Room temperature must be maintained between 65 ー workmanship is employed in the and 85 ーf 18 ー and 30 ーc with hvac system operating.
In the case of lvt some manufacturers suggest that you can replace individual damaged tiles while others suggest that doing so would compromise the integrity of the installation.
Once the old covering has been removed the subfloor will almost certainly show signs of damage.
Our flooring products are specified to meet any technical requirements while creating a happier healthier and more productive environment.